Cold cutting and beveling for 24-inch pipeline tie-ins

Split-frame OCE-630 machines cut out damaged sections and prepare weld-ready bevels on live-plant pipelines where hot work permits are restricted.

Cold cutting and beveling for 24-inch pipeline tie-ins

The Challenge

Tie-ins on an operating pipeline corridor have two hard constraints: no open flame near hydrocarbons, and a cut end that is square and correctly beveled so the welding crew can fit up straight away. Torch cutting followed by grinding fails the first constraint and is slow on the second.

Our Solution

The crew mounts an OCE-630 split frame around the pipe without needing access to an open end. The tool slide carries a parting tool and a 37.5° bevel tool together, so the pipe is cut and beveled in one rotation at 11 r/min. Because the process is cold, there is no heat-affected zone to grind back and the operation can run under a cold-work permit.

Workflow

  1. Mark and wrap the cut line, check ovality
  2. Open the split frame, close it around the pipe and level the four clamping legs
  3. Set the parting tool and 37.5° bevel tool on the slide
  4. Cut and bevel in one pass; measure land and angle with a bevel gauge
  5. Move to the second cut and repeat; hand over to the welding crew

Result

Each cut leaves a square end with a uniform land, ready for fit-up without grinding. The same frame covers 18–24 inch lines by changing the clamping inserts, so one kit serves most of the corridor.

EQUIPMENT

Machines Used in This Project

CONTACT US

Planning a Similar Project?

Tell us your material, plate thickness or pipe size and the bevel you need. Our engineers will recommend the right machine and send a quotation within 24 hours.

Send Us a Message

Fields marked * are required.

We reply within 24 hours on working days